| Tim Moon & Mike Weber will head up 2-4 teams to install Low Flow toilets around the church (13 total) Helpful to have some guys with some plumbing savvy or at least one on the team as a team leader. Requires shutting down water temporarily to replace valves and working around typical ministry happenings. Working during the week may be possible but typically a Saturday morning 0800-1200 would serve best. | open | Denny Armstrong & Randy Guzik are gathering a team to go to work in New Orleans with the rebuilding effort. See/contact either of them for more information. Tenative Departure date is April 17, 2008 - this date may change, please confirm with Randy or Denny. Randy Guzik / randyguzik@sbcglobal.net |
open | ||
| 2. Roger Lucic & Kevin Wahl will be pulling new cable throughout sections of Fellowship Hall once an electrician installs a ground cable to the panel. Needs a few helpers to pull cable. | open | Single Woman Assist - needs a 22 inch X 40 ft and 3 ft X 6 Ft concrete pad to be framed and poured. | open | ||
| 3. Various old copper cables could be recycled for $3.00 per pound. Collect remnants of copper wire, take to recycle and bring back check. | open | ||||
| 4. Old theatrical spotlights, a surplus NSI controller, some old audio equipment, etc. could be sold on eBay by someone with eBay savvy providing church funds and getting rid of clutter. See Roger Lucic. | open | ||||
| 5. Replace bathroom fan in Preschool bathroom. Roger has. | open | ||||
| 6. Replace fluorescent bulbs throughout Fellowship Hall & Kitchen. | open |
|
|||
| 7. Install fluorescent fixtures in overhead of Loft. Run wiring. | open | ||||
| 8. *Prepare, caulk & paint around upstairs door windows to stop water penetration into wall next to double doors from patio. Wall then needs to be screed, re-plastered and painted. | open | ||||
| 9. Build wall to wall bookshelves in new Music Director’s Office. (Approx 10’ X 9’ hi) (Need woodworker) | open | ||||
| 10. *Build large shelving units for holding large plastic tubs owned by Alanon, AA, Lifestage classes, etc. to remove the clutter accumulating in the Fireside Room, FH Entry closet and FH#3. | open | ||||
| 11. Clean ovens, stove & stainless walls. | open | ||||
| 12. Design/procure/build earthquake protection from boxes on shelves above Jason & Gary’s desks. | open | ||||
| 13. Reupholster blue chairs in Fellowship Hall (20-30) (have electric staple gun | open | ||||
| 14. Paint new Workshop & Storeroom Exterior Stucco wall | open | ||||
| 15. Install urinal & stall signs for advertising. | open | ||||
| 16. Repair two 48 inch tables in Carpenter Shop. Needs metal work/maybe welding. | open | ||||
| 17. Come up with system to darken Lighthouse windows and install. (Current blinds do not darken room enough) Maybe install Window Shade or curtains over blinds. | open | ||||
| 18. Pews in back of sanctuary need to be bolted down. (Drill/screw into concrete floor) | open | ||||